Contractors (non-roofing) · KardinalEye
How many fence posts do I need? Posts, panels and concrete, counted run by run

Fence bids go wrong in two places: the post count and the concrete. Both are simple math once you count the fence the right way, which is one straight run at a time. Here's how, with worked examples, and how KardinalEye does it from a line drawn on an aerial photo.
Step 1: Break the fence into straight runs
A run is one straight line between two points where the fence turns, starts, stops or has a gate. Measure each run's length on its own. A backyard with a gate on the side is usually four or five runs, not one number.
Step 2: Posts per run
For each run:
- Sections = run length ÷ post spacing, rounded up.
- Posts = sections + 1.
Worked example: a 72-foot run with 8-foot spacing. 72 ÷ 8 = 9 sections, so 10 posts.
When two runs meet at a corner, they share the corner post. Add the runs up, then subtract one post for every shared corner.
Worked example: a yard fenced on three sides: runs of 100, 60 and 100 feet at 8-foot spacing.
- 100 ÷ 8 = 12.5, rounded up to 13 sections = 14 posts
- 60 ÷ 8 = 7.5, rounded up to 8 sections = 9 posts
- 100 feet again = 14 posts
- Total 37, minus 2 shared corners = 35 posts
Step 3: Separate the heavy posts
Corner, end and gate posts carry more load, so many crews set them bigger or deeper. Count them on their own line so they're priced on their own line. In the example above: 2 corners and 2 ends, plus 2 gate posts for each gate you add.
Step 4: Panels, rails and pickets
- Panel fence: panels = sections. 13 + 8 + 13 = 34 panels in the example.
- Rails: sections × rails per section (often 2 or 3).
- Pickets: run length in inches ÷ (picket width + gap), rounded up, per run.
Step 5: Concrete per post hole
A post hole is a cylinder: volume = π × radius² × depth. Subtract the part the post fills, and you have the concrete.
Worked example: a 10-inch-wide hole, 30 inches deep, with a 4×4 post (3.5 × 3.5 inches actual).
- Hole: π × (5 ÷ 12 ft)² × 2.5 ft = 1.36 cubic feet
- Post: (3.5 ÷ 12)² × 2.5 = 0.21 cubic feet
- Concrete: 1.36 − 0.21 = 1.15 cubic feet per hole
Check the yield printed on the bag you buy. Many 80-pound bags list about 0.6 cubic feet, which would make this hole about 2 bags. For 35 posts that's about 70 bags before any extra. Hole width and depth depend on the post, the soil and your local code and frost depth, so set those from your own practice.
Doing it from the drawing
Driving out with a wheel and a tape before every bid costs a morning, and converting feet to posts, bags and panels by hand is where line items go missing. In KardinalEye you draw the fence line on free 1-ft aerial photos, and the drawing gives you lengths right away. Spacing turns them into posts, bags and panels, priced from your own book (materials, labor hours, crews, waste, overhead and profit), with every number traced and a scope check.
Then the proposal goes out as Good / Better / Best, is signed on screen, and the job tracks to paid on the build board. For concrete slabs and gravel, see cubic yards, tons and posts from one drawing.
Price: $120 for 30 days or $1,200 for a year, one payment, no automatic renewal, one key for the whole business. The 7-day demo is free in your browser.